Feb 16, 2008 #1 S ssolomon Enthusiast Joined Nov 15, 2007 Posts 1 Reaction score 0 I just received a status report on my new 2008 Viper as a D1 with Vin number. Does anybody have any clue how long from this point for delivery?
I just received a status report on my new 2008 Viper as a D1 with Vin number. Does anybody have any clue how long from this point for delivery?
Feb 16, 2008 #2 X xlr8ion Enthusiast Joined Nov 9, 2007 Posts 192 Reaction score 0 Location Scottsdale,AZ Along time
Feb 17, 2008 #3 GRNBGON Enthusiast Joined Jan 11, 2008 Posts 462 Reaction score 0 Location Cadillac, Michigan AMEN to that.
Feb 17, 2008 #4 L Lee00blacksilverGTS Enthusiast Joined Jul 27, 2000 Posts 6,595 Reaction score 1 Location Severna Park, Maryland D1 is actually pretty good, KZ status is the one you want to hear though. UNSCHEDULED BB - fleet order only - review by bid department BD - special equipment processing BE - edit error - coding error which must be corrected before order can be considered for scheduling BG - order has passed edit, but cannot be scheduled regardless of priority or sold status F - Financial hold B - model or option B - build out L - material restriction M - material hold (fleet) BX - good order available for scheduling SCHEDULED C - tentative schedule D - firm schedule: serial number is assigned, appropriate time in station (5) working days D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days BUILD E - framing F - paint G - trim BUILT I - unit is built pending final inspection J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.) JB - shipped to body vendor JE - shipped to emissions JS - shipped to storage KZ - released by plant and invoiced TRAFFIC CODES KZL - released but not shipped KZX - delivered to dealer
D1 is actually pretty good, KZ status is the one you want to hear though. UNSCHEDULED BB - fleet order only - review by bid department BD - special equipment processing BE - edit error - coding error which must be corrected before order can be considered for scheduling BG - order has passed edit, but cannot be scheduled regardless of priority or sold status F - Financial hold B - model or option B - build out L - material restriction M - material hold (fleet) BX - good order available for scheduling SCHEDULED C - tentative schedule D - firm schedule: serial number is assigned, appropriate time in station (5) working days D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days BUILD E - framing F - paint G - trim BUILT I - unit is built pending final inspection J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.) JB - shipped to body vendor JE - shipped to emissions JS - shipped to storage KZ - released by plant and invoiced TRAFFIC CODES KZL - released but not shipped KZX - delivered to dealer