:idea:if they build 12-15 vipers a day, and they build 1500 total. that would put them around 4 months. what do they do the rest of the time?:dunno:
 

GRNBGON

Enthusiast
Joined
Jan 11, 2008
Posts
462
Reaction score
0
Location
Cadillac, Michigan
Yes, they do 8 per day max if they have the parts. There have been holdups due to vendor problems. The craftsman on the line are very good at what they do and make sure everything is as it should be.:headbang: I for one do not want to hurry them. Let them do their job as best they can with the supplies they get. A piece of art takes time. Let them take the time and do it right.:usa:
 
OP
OP
M

musicncars

Enthusiast
Joined
Feb 6, 2008
Posts
1,397
Reaction score
0
Location
The Mountains
Yes, they do 8 per day max if they have the parts. There have been holdups due to vendor problems. The craftsman on the line are very good at what they do and make sure everything is as it should be.:headbang: I for one do not want to hurry them. Let them do their job as best they can with the supplies they get. A piece of art takes time. Let them take the time and do it right.:usa:

i agree, hand built, awesome car,:2tu: take your time do it right. build three a day, if you ask me.:) i was only trying to utilize my very limited math skills. using the information that i heard, trying to put 2 + 15 together and trying to figure nothing out.
 