gts_2001
Enthusiast
From DCX:
Hope this helps us keep track of our "Babies" !
ORDER STATUS CODES
Unscheduled
BX – good order available for scheduling
BB – fleet order only – review by Bid Department
BD – special equipment processing
BE – edit error – coding error which must be corrected before the order can be considered for scheduling
BG – order has passed edit but cannot be considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B – model or option hold
BG B – build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA – cancelled order
Scheduled
C – tentative schedule
D – firm schedule: serial number is assigned
D1 – gateline: plant has sequenced the unit for production, estimated ship date assigned
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD – mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other carrier codes that currently post an "O" delay code that are not included above
KZ R – vehicle with a few days of arrival to dealer
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
I sure hope "JB" proceeds quickly! (Damn, gotta get this car streeted before the snow flies!!)
BTW: here's where the first of the SRT-10 First Edition Coupes are now: Prefix Corporation
Hope this helps us keep track of our "Babies" !
ORDER STATUS CODES
Unscheduled
BX – good order available for scheduling
BB – fleet order only – review by Bid Department
BD – special equipment processing
BE – edit error – coding error which must be corrected before the order can be considered for scheduling
BG – order has passed edit but cannot be considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B – model or option hold
BG B – build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA – cancelled order
Scheduled
C – tentative schedule
D – firm schedule: serial number is assigned
D1 – gateline: plant has sequenced the unit for production, estimated ship date assigned
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD – mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other carrier codes that currently post an "O" delay code that are not included above
KZ R – vehicle with a few days of arrival to dealer
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
I sure hope "JB" proceeds quickly! (Damn, gotta get this car streeted before the snow flies!!)
BTW: here's where the first of the SRT-10 First Edition Coupes are now: Prefix Corporation