Anyone know what "JB" Status is?
Anyone know what "JB" Status is?
Thank You Smog Dog.JB=shipped to body vendor. Sounds like you're getting your stripes. Ought to be back at Conner in about 2 weeks and ready to ship. Congratulations! Very nice color.![]()
Anyone know what "JB" Status is?
Damn Lee, I guess you couldn't get more specific then that could you? Great job, thanks.SCHEDULED
- BB - fleet order only - review by bid department
- BD - special equipment processing
- BE - edit error - coding error which must be corrected before order can be considered for scheduling
- BG - order has passed edit, but cannot be scheduled regardless of priority or sold status
- F - Financial hold
- B - model or option
- B - build out
- L - material restriction
- M - material hold (fleet)
- BX - good order available for scheduling
BUILD
- C - tentative schedule
- D - firm schedule: serial number is assigned, appropriate time in station (5) working days
- D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days
BUILT
- E - framing
- F - paint
- G - trim
TRAFFIC CODES
- I - unit is built pending final inspection
- J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.)
- JB - shipped to body vendor
- JE - shipped to emissions
- JS - shipped to storage
- KZ - released by plant and invoiced
- KZL - released but not shipped
- KZM - first rail departure
- KZN - first rail arrival
- KZO - delayed/received
- KZT - second rail departure
- KZU - second rail arrival
- KZX - delivered to dealer
Black Stripes and I ordered the H Wheels but I can't confirm the wheels there not on the Dealer invoice I looked at, So it may mean the standard wheels are coming on it.Snakeplissken - What color stripes did you order? What rims?
Is it safe to assume that after it returns fron getting the stripes it is shipped out or are there 12 more steps?SCHEDULED
- BB - fleet order only - review by bid department
- BD - special equipment processing
- BE - edit error - coding error which must be corrected before order can be considered for scheduling
- BG - order has passed edit, but cannot be scheduled regardless of priority or sold status
- F - Financial hold
- B - model or option
- B - build out
- L - material restriction
- M - material hold (fleet)
- BX - good order available for scheduling
BUILD
- C - tentative schedule
- D - firm schedule: serial number is assigned, appropriate time in station (5) working days
- D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days
BUILT
- E - framing
- F - paint
- G - trim
TRAFFIC CODES
- I - unit is built pending final inspection
- J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.)
- JB - shipped to body vendor
- JE - shipped to emissions
- JS - shipped to storage
- KZ - released by plant and invoiced
- KZL - released but not shipped
- KZM - first rail departure
- KZN - first rail arrival
- KZO - delayed/received
- KZT - second rail departure
- KZU - second rail arrival
- KZX - delivered to dealer
my viper red has moved to C status
How do you guys track the status? Do you just call the dealer?
Don't quite know what smogdog means, it will go through the final 12 code steps but as he says it may happen more quickly than before.
Anyone know what "JB" Status is?